KEMAPCO ADMINISTRATION BUILDING
1600m2 three storey building including high quality stone facades with all types of decorations, marble flooring Read More
Aqaba Entertainment Plaza Centre
Construction of entertainment center, 8800m2 three storey building with unique architectural features including Read More
EPIC OF COMMON UTILITIES AND
The Scope of Work Comprises of The Engineering Design, Procurement, Installation and Commissioning of the Common Read More
Engineering, Procurement &
Design & construct about 4 kilometers of pipe racks constructed at the Lee Break water up to berth 3A/3B. including Read More
Royal Basin Marina, Aqaba - Jordan
Dredging works, extending breakwater and placing armour rocks, sheet pile quay walls, precast concrete quay walls , Read More
Development of Al Khor Port and
The works involves the development of Al Khor Port and the deepening and widening of the navigation channel. The Read More
Royal Yacht Club Marina, Aqaba -
- Dredging works. - Construction of Breakwater. - Concrete Quay walls composed of 24ton precast elements & cast Read More
DEVELOPMENT OF AL RUWAIS PORT &
Project Packages included the following works : - Dredging of AlRuwais approach channel, - Dredging Port Basins, Read More
Halul Harbour Upgrade, Phase II
Engineering, procurement , construction and commissioning of the second phase of Halul Harbour. The major works Read More
General Cargo Berth 7-Aqaba
Structural repair of the general cargo berth no.7 in Aqaba ports, the works included demolishing and rebuild works to Read More
Container Berth and Ro-Ro Terminal
Structural repair and rehabilitation including condition surveys, detailed construction methods, special mix designs Read More
JFI Industrial Jetty
The works comprise all operations necessary to construct, complete and maintain the rehabilitation works for the JFI Read More
Sea Water Intake and F.F.Pump House
Civil works & electro-mechanical installations including well point dewatering system, excavation down to 5m below sea Read More
Sheikh Hussein Bridge Crossing
An earth platform was constructed over the river bed for staging construction equipments and activities, Pre-cast Read More
Wadi Mujib Cable Stay Bridge
� Modified cable-saty bridge 140m span, consisting of prestressed post-tensioned stays and box girders, precast Read More
MgO Sinter Silos
The scope of works included the design and the detailed design, fabrication, manufacturing, procurement, construction, Read More
Wala Pumping Station Project and
- 6000m3 concrete water reservoir., - Site civil works including retaining and gabion walls, control building, Read More
Wala Well Field Project
- 4.2km of 32" water pipes c/w valves & fittings. - Gabion protection works. - 33m span concrete pipe bridge. - 4km Read More
Disi Irrigation Project
Reclamation of 35000 donum of land including landscaping , earth and concrete reservoirs, maintenance hangers, Read More
Salt Storage and Shipping Terminal
120meter long 15m high R.C. stacker structure and 150m long underground gallery (tunnel), with capacity to stockpile Read More
NOP and DCP Bagging and Storage
Construction about 10000m2 , power floated floor slabs, concrete pedestals, raft foundations for product silos, wide Read More
NOP and DCP Bagging and Storage
The main plant of KEMAP project, the main contractor was the Tenth Construction Company of Sinopec (China). CECC scope Read More
APC Hot Brine Thickener
- Fabrication, welding & erection of carbon steel tank dia. 47m., - R.C tank ring beam foundation., - R.C Read More
Safi Salt Plant, Dead Sea
Civil Works and Electro-Mechanical Installations of the Salt Washing Plant Safi - Jordan. The Works included the Read More
Aqaba South Petroleum Installation
Construction of all civil works of the project which compose the infrastructure, foundation, concrete works, earth Read More