Wala Pumping Station Project and Water Reservoir


  • Client/ Owner : Water Authority Of Jordan
  • Location : Jordan
  • Period : 1992/1994
  • Designers and consultants : Ruqn Al Handasah Archts & Engineers, Jordan

More Information :

• 6000m3 concrete water reservoir.
• Site civil works including retaining and gabion walls, control building,
   power and Pump Houses, storm drainage systems.
• 2.5km of asphalt road c/w pipe and box culverts.
• Electro-mechanical works including 5 No. 640KW horizontal pumps, 
  2 No. 1020KW gensets, site pipe works complete with valves and
  fittings.